Projects

Project : EBC Pont-Rouge

Location : Pont-Rouge

Year of work : June 2011

The site : Réfection du pont de la rivière Jacques Cartier

Our contribution :
Forage pour la pose d’encrage

Project : Expansion of the incinerator

Location : Lévis, Qc

Year of work : 2009

The site : Site Redevelopment

Our contribution :
Blasting. Vibration control

Project : Réfection du barrage de Scotstown

Location : Scotstown

Year of work : June 2011

The site : Barrage de L’Étang Mill

Our contribution :
Forage pour la pose d’encrage pour solidification du barrage.

Project : Boulevard Champlain

Location : Québec

Year of work : September 2010

The site : Boulevard Champlain

Our contribution :
Forage et pose d’encrage pour la stabilisation de la paroi rocheuse surplombant le boulevard

Project : CAF

Location : Vieux Québec

Year of work : June 2010

The site : Fondation immeuble La Capitale

Our contribution :
Forage de casing à travers béton et mort-terrain pour pose d’encrage au roc

Project : Allen

Location : Ste-Brigitte de Laval

Year of work : May 2010

The site : Continuation de la rue des Monardes

Our contribution :
Forage et dynamitage pour égout-aqueduc et terrain

Project : Chemin des Ilots

Location : Lac-Beauport

Year of work : September 2009

The site : Chemin du Moulin

Our contribution :
Forage et dynamitage pour les fondations d’une nouvelle rue

Project : Installation of sewer services aqueduct

Location : LT Development, Beauport

Year of work : 2002-2009

The site : Sewer Aqueduct

Our contribution :
Trench blasting in urban areas. Vibration control

Project : Development le Montagnard

Location : Edmundston, New Brunswick

Year of work : 2001 to 2009

The site : Sewer Aqueduct

Our contribution :
Drilling and blasting of rock in trench.

Project : Golf Mont Tourbillon

Location : Lac Beauport, Qc

Year of work : 2001 to 2009

The site : Levelling of several green

Our contribution :
Drilling and blasting of rock

Project : Arno

Location : Rimouski

Year of work : November 2008

The site : Ligne hydroélectrique au sud de Rimouski

Our contribution :
Forage pour la pose d’encrage des pylônes

Project : Complexe Delta

Location : Boulevard Laurier, Ste-Foy, Qc

Year of work : 2008

The site : Building for Office

Our contribution :
Anchoring for drilling.

Project : Hotel Dieu Hospital in Lévis

Location : Lévis, Qc

Year of work : 2008

The site : Construction of a new parking

Our contribution :
Drilling and blasting 15,000 cubic meters of rock, precut. Blasting beside the hospital. Restriction at the level of vibration. Restricted blasting due to surgical procedures.

Project : Highway 50

Location : Sector Grenville

Year of work : 2008

The site : Extension of Highway 50

Our contribution :
Drilling and blasting of 180,000 cubic meters of rock.

Project : Highway 175

Location : Laurentian Park, 116 km

Year of work : 2008

The site : Enlargement of channels

Our contribution :
Drilling and blasting of 180,000 cubic meters of rock. Blasting in the presence of high-voltage lines. Restricted blasting due to traffic.

Project : Highway 50

Location : Thurso, Qc

Year of work : 2007

The site : Extension of Highway 50

Our contribution :
Drilling and blasting of 870,000 cubic meters of rock.

Project : Highway 25

Location : Terrebonne, Qc

Year of work : 2007

The site : Enlargement of road and new ramp

Our contribution :
Drilling and blasting of 240,000 m³. Blasting in the presence of high-voltage lines. Restricted blasting due to traffic.

Project : Renovation at the airport in Quebec

Location : Quebec City

Year of work : 2007

The site :

Our contribution :
Drilling for Anchorage.

Project : Installation of sewer services aqueduct

Location : St-Jean, Ile d'Orleans

Year of work : 2007

The site : Gymnasium Annex to school

Our contribution :
Trench blasting in the village. Vibration control.

Project : Centrale 25 GW

Location : Marathon, Ontario

Year of work : 2006

The site :

Our contribution :
Drilling and blasting for hydrant

Project : Hospital Montmagny

Location : Montmagny, Qc

Year of work : 2006

The site : Construction of a new pavilion

Our contribution :
Drilling and blasting of 15,000 cubic meters of rock. Blasting beside the hospital. Restriction at the level of vibration. Blasting restricted due to surgical procedures.

Project : Seminar of the Marist Fathers

Location : Sillery, Qc

Year of work : 2006

The site : Gymnasium Annex to school

Our contribution :
Anchoring for drilling. Blasting near the school. Vibration control

Project : Simons

Location : Quebec, Rue St-Jean

Year of work : 2005

The site : Enlargement

Our contribution :
Drilling and anchoring

Project : Hydro-Québec

Location : St-Jean Chrysostome

Year of work : 2005

The site : Enlargement

Our contribution :
Drilling for weakening

Project : Les terrasses Maisonneuve

Location : Québec, Boul. René Lévesque

Year of work : 2005

The site : Construction of underground parking

Our contribution :
Drilling, blasting in urban

Project : Chateau Laurier

Location : Quebec, Qc

Year of work : 2005

The site : Construction of underground parking

Our contribution :
Drilling, blasting in urban areas - 25 000 cubic meters

Project : Palais Montcalm

Location : Quebec, Qc

Year of work : 2004

The site : Renovation of Building

Our contribution :
Drilling and blasting of rock, inside the theater. Restriction at the level of vibration.

Project : L’Isle-aux-Grues

Location : Montmagny

Year of work : 2004

The site : Construction of experimental wave breaker

Our contribution :
Drilling and anchoring

Project : Church of St. Vincent de Paul

Location : Quebec city

Year of work : 2004

The site : Expansion of a parking

Our contribution :
Drilling and blasting

Project : Massif de la petite rivière St-François

Location : Baie St-Paul

Year of work : 2003

The site : Ski slope

Our contribution :
Drilling and blasting for leveling track

Project : CN

Location : Charny, Qc

Year of work : 2003

The site : Chaudière River Bridge

Our contribution :
Solidification of pillar drill and anchor

Project : Hôtel Dieu de Québec

Location : Quebec city

Year of work : 2002

The site : Solidifying the west wall

Our contribution :
Drilling and anchoring

Project : Aquarium of Quebec

Location : Quebec

Year of work : 2001

The site : Enlargement

Our contribution :
Drilling and blasting trench and basin.

Project : Parking Millennium

Location : Quebec, St-Roch neighborhood

Year of work : 2001

The site : Underground parking

Our contribution :
Drilling and blasting 135,000 tons

Project : St-Augustin de Saguenay

Location : Basse Côte-Nord

Year of work : 2000-2001

The site : Sewer, aqueduct

Our contribution :
Drilling and blasting trench of 5km