Projects
Project : EBC Pont-Rouge
Location : Pont-Rouge
Year of work : June 2011
The site : Réfection du pont de la rivière Jacques Cartier
Our contribution :
Forage pour la pose d’encrage
Project : Expansion of the incinerator
Location : Lévis, Qc
Year of work : 2009
The site : Site Redevelopment
Our contribution :
Blasting. Vibration control
Project : Réfection du barrage de Scotstown
Location : Scotstown
Year of work : June 2011
The site : Barrage de L’Étang Mill
Our contribution :
Forage pour la pose d’encrage pour solidification du barrage.
Project : Boulevard Champlain
Location : Québec
Year of work : September 2010
The site : Boulevard Champlain
Our contribution :
Forage et pose d’encrage pour la stabilisation de la paroi rocheuse surplombant le boulevard
Project : CAF
Location : Vieux Québec
Year of work : June 2010
The site : Fondation immeuble La Capitale
Our contribution :
Forage de casing à travers béton et mort-terrain pour pose d’encrage au roc
Project : Allen
Location : Ste-Brigitte de Laval
Year of work : May 2010
The site : Continuation de la rue des Monardes
Our contribution :
Forage et dynamitage pour égout-aqueduc et terrain
Project : Chemin des Ilots
Location : Lac-Beauport
Year of work : September 2009
The site : Chemin du Moulin
Our contribution :
Forage et dynamitage pour les fondations d’une nouvelle rue
Project : Installation of sewer services aqueduct
Location : LT Development, Beauport
Year of work : 2002-2009
The site : Sewer Aqueduct
Our contribution :
Trench blasting in urban areas. Vibration control
Project : Development le Montagnard
Location : Edmundston, New Brunswick
Year of work : 2001 to 2009
The site : Sewer Aqueduct
Our contribution :
Drilling and blasting of rock in trench.
Project : Golf Mont Tourbillon
Location : Lac Beauport, Qc
Year of work : 2001 to 2009
The site : Levelling of several green
Our contribution :
Drilling and blasting of rock
Project : Arno
Location : Rimouski
Year of work : November 2008
The site : Ligne hydroélectrique au sud de Rimouski
Our contribution :
Forage pour la pose d’encrage des pylônes
Project : Complexe Delta
Location : Boulevard Laurier, Ste-Foy, Qc
Year of work : 2008
The site : Building for Office
Our contribution :
Anchoring for drilling.
Project : Hotel Dieu Hospital in Lévis
Location : Lévis, Qc
Year of work : 2008
The site : Construction of a new parking
Our contribution :
Drilling and blasting 15,000 cubic meters of rock, precut. Blasting beside the hospital. Restriction at the level of vibration. Restricted blasting due to surgical procedures.
Project : Highway 50
Location : Sector Grenville
Year of work : 2008
The site : Extension of Highway 50
Our contribution :
Drilling and blasting of 180,000 cubic meters of rock.
Project : Highway 175
Location : Laurentian Park, 116 km
Year of work : 2008
The site : Enlargement of channels
Our contribution :
Drilling and blasting of 180,000 cubic meters of rock. Blasting in the presence of high-voltage lines. Restricted blasting due to traffic.
Project : Highway 50
Location : Thurso, Qc
Year of work : 2007
The site : Extension of Highway 50
Our contribution :
Drilling and blasting of 870,000 cubic meters of rock.
Project : Highway 25
Location : Terrebonne, Qc
Year of work : 2007
The site : Enlargement of road and new ramp
Our contribution :
Drilling and blasting of 240,000 m³. Blasting in the presence of high-voltage lines. Restricted blasting due to traffic.
Project : Renovation at the airport in Quebec
Location : Quebec City
Year of work : 2007
The site :
Our contribution :
Drilling for Anchorage.
Project : Installation of sewer services aqueduct
Location : St-Jean, Ile d'Orleans
Year of work : 2007
The site : Gymnasium Annex to school
Our contribution :
Trench blasting in the village. Vibration control.
Project : Centrale 25 GW
Location : Marathon, Ontario
Year of work : 2006
The site :
Our contribution :
Drilling and blasting for hydrant
Project : Hospital Montmagny
Location : Montmagny, Qc
Year of work : 2006
The site : Construction of a new pavilion
Our contribution :
Drilling and blasting of 15,000 cubic meters of rock. Blasting beside the hospital. Restriction at the level of vibration. Blasting restricted due to surgical procedures.
Project : Seminar of the Marist Fathers
Location : Sillery, Qc
Year of work : 2006
The site : Gymnasium Annex to school
Our contribution :
Anchoring for drilling. Blasting near the school. Vibration control
Project : Simons
Location : Quebec, Rue St-Jean
Year of work : 2005
The site : Enlargement
Our contribution :
Drilling and anchoring
Project : Hydro-Québec
Location : St-Jean Chrysostome
Year of work : 2005
The site : Enlargement
Our contribution :
Drilling for weakening
Project : Les terrasses Maisonneuve
Location : Québec, Boul. René Lévesque
Year of work : 2005
The site : Construction of underground parking
Our contribution :
Drilling, blasting in urban
Project : Chateau Laurier
Location : Quebec, Qc
Year of work : 2005
The site : Construction of underground parking
Our contribution :
Drilling, blasting in urban areas - 25 000 cubic meters
Project : Palais Montcalm
Location : Quebec, Qc
Year of work : 2004
The site : Renovation of Building
Our contribution :
Drilling and blasting of rock, inside the theater. Restriction at the level of vibration.
Project : L’Isle-aux-Grues
Location : Montmagny
Year of work : 2004
The site : Construction of experimental wave breaker
Our contribution :
Drilling and anchoring
Project : Church of St. Vincent de Paul
Location : Quebec city
Year of work : 2004
The site : Expansion of a parking
Our contribution :
Drilling and blasting
Project : Massif de la petite rivière St-François
Location : Baie St-Paul
Year of work : 2003
The site : Ski slope
Our contribution :
Drilling and blasting for leveling track
Project : CN
Location : Charny, Qc
Year of work : 2003
The site : Chaudière River Bridge
Our contribution :
Solidification of pillar drill and anchor
Project : Hôtel Dieu de Québec
Location : Quebec city
Year of work : 2002
The site : Solidifying the west wall
Our contribution :
Drilling and anchoring
Project : Aquarium of Quebec
Location : Quebec
Year of work : 2001
The site : Enlargement
Our contribution :
Drilling and blasting trench and basin.
Project : Parking Millennium
Location : Quebec, St-Roch neighborhood
Year of work : 2001
The site : Underground parking
Our contribution :
Drilling and blasting 135,000 tons
Project : St-Augustin de Saguenay
Location : Basse Côte-Nord
Year of work : 2000-2001
The site : Sewer, aqueduct
Our contribution :
Drilling and blasting trench of 5km